Skip to main content
SyncHQ Pro™Every Customer. One AI Platform.

Job Checklists & Attachments

Never miss a step, always have proof

35%

Fewer callbacks and rework

100%

Step-level accountability

< 2 min

To complete a 10-item checklist

Ensure every job is completed to standard with customizable checklists and rich media attachments. Define step-by-step procedures per job type, require photo evidence for critical steps, and maintain a tamper-proof audit trail for compliance and dispute resolution.

Benefits

Why Teams Love This Feature

Custom Checklists

Build reusable checklists per job type — HVAC install, plumbing repair, electrical inspection — so every technician follows the same proven process.

Photo & File Attachments

Attach before/after photos, signed waivers, inspection reports, or any file directly to a job for complete documentation.

Completion Verification

Mark checklist items as complete with timestamps. Require photo proof or supervisor sign-off for critical steps before a job can be closed.

Audit Trail

Every checklist action is logged with who, when, and what — providing an unalterable record for compliance, insurance, and dispute resolution.

Capabilities

Powerful Features Built for Service Management

Checklist Templates

Create and manage reusable checklist templates for consistent job execution.

  • Define templates by job type with ordered steps and descriptions

  • Mark steps as required or optional, with photo-proof requirements

  • Clone and customize templates for specific customers or sites

  • Version-controlled templates with change history

Feature Screenshot

Field Execution

Technicians complete checklists on-site from any device.

  • Check off items with one tap, even while offline

  • Add notes, photos, or voice memos to individual steps

  • Visual progress indicator shows completion percentage

Feature Screenshot

Attachment Management

Organize and access all job-related files in one place.

  • Upload photos, PDFs, and documents directly from mobile camera or file picker

  • Auto-organize attachments by date, step, and category

  • Preview images and PDFs inline without downloading

  • Storage included with your plan — no per-file charges

Feature Screenshot

Compliance & Audit

Maintain proof of work for insurance, warranty, and regulatory requirements.

  • Immutable audit log records every check, uncheck, and attachment action

  • Export completed checklists as PDF reports with embedded photos

  • Filter audit history by technician, job type, or date range

Feature Screenshot
FAQ

Frequently Asked Questions

Can I create different checklists for different job types?

Yes. You can create unlimited checklist templates and assign them to specific job types. When a new job is created, the appropriate checklist is automatically attached.

Do checklists work offline?

Absolutely. Technicians can complete checklists and attach photos while offline. Everything syncs automatically when connectivity is restored.

Can I require photo proof for certain steps?

Yes. When creating a checklist template, you can mark any step as requiring a photo attachment before it can be checked off. This is ideal for before/after documentation.

How are attachments stored?

Attachments are stored securely in cloud storage (Azure Blob Storage in production) with automatic encryption at rest. Storage is included with your plan at no extra cost.

Ready to Try Job Checklists & Attachments?

All features included. No credit card required. 30-day free trial.*